BUILD & OWN FROM ABROAD

Build in Nigeria without being the coordinator.

From checking whether you can actually build what you want on that plot, through your professional team, independent site monitoring and controlled payments, to a house that's ready the day you land. One team representing you — not the contractor.

From ₦95,000· start before you buy the land

🏗️ The six stages we cover

Before you buy — can this plot take your design?
Your team — verified professionals, one brief, comparable bids
Monitoring — independent eyes, measured progress
Payments — money released against verified work
Materials — suppliers paid direct, deliveries evidenced
HomeReady — furnished, connected, ready to occupy

Use any stage on its own, or the whole journey.

One principle runs through all of this

The person asking you for money should never be the only person confirming the work was done.

Almost every diaspora building disaster has the same shape. A large advance is sent. Materials are requested vaguely. The quote was low at the start and keeps rising. Photographs arrive showing something, but nobody measures whether the work matches the money. By the time confidence collapses, a great deal has been paid and far less has been built.

It is rarely one dramatic fraud. It is the slow consequence of the contractor, the buyer's representative and the person verifying progress all being the same interest — while the person paying is 5,000 miles away with no independent view.

So we start from independence. We represent you, not the build. Our fee doesn't rise when your project costs more, we don't take a margin on your contractor's work, and we would rather tell you a payment isn't justified than keep everyone comfortable.

Where are you right now?

Two questions and we'll point you to the right starting service — including telling you if it's too early to spend anything with us.

Find your starting point

No details needed. You'll get a recommended service and its price.

1 How far along are you?
2 What worries you most?
Every service below can be bought on its own. You are not signing up to the whole journey.
1 Before you buy the land

Can you actually build what you're imagining?

Most buyers verify who owns the land. Far fewer check whether the land permits the house they have in mind. People routinely buy a plot on a verbal assurance that a duplex is fine, then discover after paying that estate rules forbid it, setbacks make the footprint impossible, or drainage work will cost more than the plot.

LOW-COST FIRST LOOK
📋

Buildability Screen

Desk-based, before you go further

A fast check of the things that most often kill a plan: zoning, permitted building types, estate regulations and obvious red flags.

  • Planning and zoning position
  • Estate-rule review where applicable
  • Permitted building types and ancillary units
  • Obvious red flags and deal-breakers
  • Clear verdict: feasible, conditional, or don't
  • Fee credited if you upgrade within 30 days
₦95,000approx. US$61 · 3–5 working days
Order a Screen
FULL REPORT
📐

Buildability Report

Before you commit to the purchase

The complete feasibility picture, including a site visit — what you can build, what it will realistically cost, and what has to happen before a single block is laid.

  • Plot and survey review
  • Planning, zoning and estate-rule assessment
  • Setback and site-coverage analysis
  • Access and infrastructure review
  • Topographical observations
  • Soil-test recommendation
  • Preliminary development options
  • Indicative approval pathway
  • Preliminary construction-cost range
  • Red-flag report
₦325,000approx. US$210 · 10–14 working days
Order a Report
Sample conclusion — Buildability Report Illustrative example of how a real report reads
Customer intentionFour-bedroom detached duplex with a two-room service building
ConclusionConditionally feasible
ConstraintPlot dimensions reduce achievable side setbacks
ConstraintEstate regulations permit only one ancillary unit
ConstraintAdditional drainage work likely to be required
ConstraintSoil investigation required before foundation specification
Cost noteIndicative development cost excludes power infrastructure and estate development levy

Quick self-check: have you confirmed these?

Tick everything you have confirmed in writing — not been told verbally. Runs entirely in your browser.

0 of 10 confirmed

Tick the items you have confirmed in writing. Anything unticked is a question a Buildability Report answers before your money is committed.

2 Assembling your team

Stop being the person who coordinates the professionals

Appointed separately, an architect, engineer and contractor will each make sensible decisions that contradict each other — and the overseas client ends up as the accidental project manager, arbitrating between specialists at midnight. We verify the professionals, standardise the brief, and hold the whole team together.

ArchitectsQuantity surveyorsStructural engineers M&E engineersLand surveyorsTown planners Geotechnical specialistsInterior designersProject managers Building inspectorsLawyers
🔍

Professional Sourcing

You appoint, we find and vet

We verify credentials, write one standardised brief, and come back with comparable proposals — so you're comparing like with like instead of three documents in three formats.

  • Credential and registration verification
  • One standardised brief issued to all
  • At least three comparable proposals
  • Scope exclusions made explicit
  • Provider scores from completed assignments
₦150,000approx. US$97 · per discipline
Source professionals
MOST POPULAR
🎨

Managed Design Team

We hold the whole team together

The full professional team appointed and coordinated through to approved drawings — with one point of accountability instead of five people emailing you separately.

  • Everything in Professional Sourcing
  • Full team assembled and coordinated
  • Deliverables recorded and tracked
  • Revisions managed, not lost in email
  • Drawings and approvals stored centrally
  • Contradictions resolved before they cost money
₦675,000approx. US$435 · through to approved drawings
Get a managed team
🏆

Design Competition

Premium projects

Several verified architects work up competing concepts to the same brief. You choose from real design responses to your plot rather than from a portfolio of other people's houses.

  • Three to five competing concepts
  • Identical brief and deliverables
  • Anonymous scoring against your priorities
  • Winning architect appointed and coordinated
  • Participation fees to entrants included
₦1,250,000approx. US$806 · concept to appointment
Run a competition
3 While it's being built

Independent monitoring — we represent you, not the build

We are deliberately not your contractor. We measure work, check materials and workmanship, review variations and recommend whether a payment is justified. A contractor requesting money should not also be the only voice confirming that the work behind that request exists.

📊

Your project dashboard — live demo

Example: 4-bedroom detached duplex, Sangotedo, Lagos

Switch scenarios above. The third is the one that matters — it's what most diaspora builds look like before anyone realises.

🔨

Foundation Plan

The stage that can't be fixed later

Setting-out, excavation, reinforcement, concrete and foundation completion — monitored, measured and photographed at each point.

  • Baseline documentation and drawing control
  • Setting-out verification against the survey
  • Reinforcement inspection before pour
  • Concrete and materials verification
  • Payment recommendation at each stage
₦395,000approx. US$255 · foundation stages
Start Foundation Plan
🏗️

Structural Plan

Frame to roof

Frame, blockwork and roofing monitored through to a watertight structure, with measured progress and workmanship checks throughout.

  • Frame and blockwork inspection
  • Roofing verification
  • Progress measurement and budget tracking
  • Variation review before you approve it
  • Defect tracking with re-inspection
₦695,000approx. US$448 · structural stages
Start Structural Plan
FULL COVER
📹

Full Build Plan

Every stage to handover

Continuous independent monitoring from mobilisation to completion certification, with the dashboard above kept current throughout.

  • All twelve monitoring services
  • Programme and budget tracking
  • Independent quantity measurement
  • Contractor payment recommendations
  • Delay reporting and defect tracking
  • Completion certification support
from ₦1,650,000or 2.75% of construction value, whichever is greater
Start Full Build Plan
WHEN IT'S GONE WRONG
⚠️

Rescue Plan

Stalled or disputed projects

Most people call us only after confidence has collapsed. We establish independently what has actually been built, what it was worth, what was paid, and what it will cost to finish.

  • Independent status assessment
  • Measured value of work genuinely completed
  • Reconciliation against amounts paid
  • Defect and quality schedule
  • Cost-to-complete report
  • Options: continue, re-tender, or stop
₦595,000approx. US$384 · 2–3 weeks
Get a Rescue report
📋

What monitoring covers

All twelve services
  • Baseline project documentation
  • Approved drawings and specification control
  • Programme and budget tracking
  • Site visits
  • Progress measurement
  • Materials verification
  • Workmanship inspection
  • Variation review
  • Contractor-payment recommendation
  • Delay reporting
  • Defect tracking
  • Completion certification support
Estimate my cost
4 Paying for it safely

Money released against verified work — not against promises

The alternative to sending unrestricted lump sums to a contractor or a relative. Funds are tied to a defined scope, and nothing is released until independent eyes confirm the work behind it exists.

The nine standard milestones

1 Site mobilisation
2 Foundation completion
3 Ground-floor slab
4 Structural frame
5 Roofing
6 First-fix M&E
7 Plastering
8 Finishes
9 Practical completion

Six gates before any payment is released

1
Evidence submittedContractor submits evidence of the completed scope
2
Independent inspectionOur monitor attends and records what exists
3
MeasuredQuantity surveyor confirms measured work where appropriate
4
You reviewThe report goes to you before anything moves
5
You authorisePayment happens only on your instruction
6
RecordedThe transaction is logged to your project record
💰

Milestone Payment Control

Structured release of your funds

Each payment is tied to a defined milestone and released only after the six gates above. You keep control; we provide the verification and the record.

  • Scope defined and priced per milestone
  • Independent verification before every release
  • Full audit trail of every authorisation
  • Payments made through licensed providers only
  • Dispute position documented as you go
1.5% of funds administeredminimum ₦25,000 per milestone
Set up payment control
🚚

Materials Procurement

Suppliers paid direct, not through the build

Framework agreements with verified suppliers, paid directly rather than routing your materials budget through a contractor — with delivery and batch evidence for what arrives.

  • Cement, steel, blocks, roofing, tiles
  • Sanitary, electrical, doors and windows
  • Solar, generators, inverters, security systems
  • Supplier verification and delivery confirmation
  • Batch and product evidence on arrival
  • Customer-approved substitutions only
  • Purchase-order matching and price-change audit trail
  • Returns and defect process
5% procurement feeon materials value · framework pricing usually saves more than the fee
Discuss procurement

⚠ How we handle your money — read this properly

We do not operate an informal escrow, and you should be extremely wary of any Nigerian property service that does. Holding or moving customer funds engages financial-services, payment, escrow, anti-money-laundering and consumer-protection obligations that a property platform is not entitled to sidestep.

Payments are therefore made through properly licensed banks, payment institutions or trustees. Our role is verification, authorisation workflow and record-keeping — confirming that the work justifying a payment genuinely exists, and documenting your instruction — not acting as an unlicensed holder of your money.

Where a specific arrangement requires a licensed partner we will name that partner to you before you commit, and the terms on which they hold funds will come from them, not from us.

5 If you want more of it handled

Turnkey routes — and why we're building them in this order

We could promise to deliver your whole build tomorrow. We'd rather not, yet — because guaranteeing outcomes from contractors whose performance nobody has actually measured is how these services fail. We're collecting that data through monitoring first, and we'll tell you honestly which routes are open today.

AVAILABLE NOW

Managed Tender

We prepare the scope, obtain contractor bids, run a like-for-like comparison and manage selection. You contract directly with the contractor, so the commercial relationship stays yours — and our independence stays intact.

₦850,000 · scope to signed contract
AVAILABLE NOW

Construction Management

You appoint trades and suppliers separately; our project manager coordinates them, sequences the work and holds the programme. Suits clients who want control over who does what without doing the coordinating.

from ₦2,450,000 · or 4% of construction value
BY INTRODUCTION

Design & Build Partner Marketplace

A verified partner takes delivery responsibility under a defined contract. We only introduce partners with monitored performance history on our own projects — which means the list is short, and deliberately so.

Introduction fee ₦450,000 · partner contracts directly with you
IN DEVELOPMENT

Guaranteed Completion

A bank, insurer, developer or contractor provides a completion bond or similar guarantee, with us supplying project data and monitoring. This depends on third-party underwriters, so we won't pretend it's live before it is.

Priced by the guarantor · register interest below
What we're measuring, and why it matters to you. Every monitored project adds to a contractor performance record: quotation accuracy, delay history, variation frequency, defect rate, dispute rate, financial capacity, customer satisfaction, responsiveness and feedback from the professional team. That record is what will eventually let anyone credibly guarantee a completion date. Until it exists, a guarantee is just a confident sentence.
6 When the building is finished

HomeReady — a finished structure is not a home

Handover gives you a building. It doesn't give you power that works, water you can drink, internet, furniture, a working generator, utility accounts in your name, or someone at the airport. HomeReady closes that gap so the house is genuinely usable the day you arrive.

🔑

Rental-ready

You're letting it out

Defect inspection, deep clean, essential appliances, utilities connected and the property presented to let. Furnished to a durable letting standard, not a showroom one.

from ₦1,450,000approx. US$935 · indicative, specification-dependent
Enquire
🏠

Holiday-home ready

You visit a few times a year

Set up to be closed down safely and reopened quickly — with security, power, water treatment and a maintenance schedule that runs while you're away.

from ₦2,450,000approx. US$1,581 · indicative
Enquire
HIGHEST RETURN
🛋️

Short-let ready

You're running it as a short let

Furnished, styled and equipped to the standard guests actually book — including inverter or solar backup, fast internet, linen sets and a full digital inventory.

from ₦2,850,000approx. US$1,839 · indicative
Enquire
🌳

Retirement-ready

You're moving back

Set up for permanent living with accessibility considered, reliable power and water, landscaping, domestic staffing support and local utility accounts in your name.

from ₦3,250,000approx. US$2,097 · indicative
Enquire
💼

Executive furnished

Corporate or premium tenants

Specified and furnished to the standard corporate tenants and expatriate lets expect, with full appliance packages, security systems and managed servicing.

from ₦4,500,000approx. US$2,903 · indicative
Enquire
✈️

Family relocation ready

The whole family is moving

Everything in retirement-ready plus the relocation layer: school-run logistics considered, domestic staffing, home insurance and airport-to-property arrival support.

from ₦3,850,000approx. US$2,484 · indicative
Enquire
Every package includes a digital inventory. Each supplied item recorded with its warranty and maintenance schedule — so when the inverter fails in year two, you know what it is, who installed it, whether it's still covered and who to call. Included services across the packages: defect inspection, deep cleaning, furniture procurement, appliance installation, internet setup, solar or inverter installation, water treatment, security systems, landscaping, generator servicing, utility accounts, domestic staffing, home insurance and airport-to-property arrival support.

Package prices are indicative starting points covering procurement, installation and our project management. Final cost depends on your specification and property size, and you receive a fully itemised quotation before anything is ordered.

Estimate your build support costs

See what independent monitoring, payment control and materials procurement would cost on your project — and what that is as a share of your build budget.

Build support estimator

Indicative only. Every project is scoped and quoted in writing before anything starts.

1 Estimated construction budget (₦)
2 Which monitoring plan?
3 Add-ons
Indicative cost
Monitoring—
Estimated total—

Materials procurement assumes materials at roughly 55% of construction budget, a common planning assumption — your actual split will differ and we quote on real figures.

Tell us about your project

Whatever stage you're at — including "I've just seen a plot" or "it's stalled and I don't know what I've paid for." We come back within one working day with a written scope and fixed price.

1 Your project

Select a serviceIndicative fee

Percentage-based and "from" services are quoted on your actual figures. Nothing is charged until you approve a written scope.

Where are you up to? *

2 About you

🔒 No payment now. We'll tell you honestly if a cheaper service would do, or if it's too early to spend anything.

Common questions

Including the ones with uncomfortable answers.

Because the moment we become your contractor, we stop being the independent party checking your contractor — and independence is the whole value here. We do offer Managed Tender and Construction Management, where you contract with the builder and we represent you. Full turnkey with guaranteed completion needs a real contractor performance record behind it, which we're building through monitoring first.

No. Holding or moving client funds triggers financial-services, payment, escrow, anti-money-laundering and consumer-protection obligations, and we won't run an informal escrow. Payments go through properly licensed banks, payment institutions or trustees. What we provide is the verification that the work exists, the authorisation workflow, and the record — and we'll name any licensed partner before you commit.

Our monitoring, buildability and payment-control fees are what you see on this page, and they don't rise if your project costs more — that's deliberate, because a monitor whose income grows with your budget isn't monitoring. On materials procurement we charge a stated 5% procurement fee. Where any supplier arrangement would also pay us, we disclose it to you in writing before you commit, and you can decline that route and buy direct.

That's exactly what Rescue Plan is for, and most people who call us are at that point. We establish independently what has actually been built, what it was genuinely worth, what you've paid, and what it will cost to finish. Sometimes the answer is that continuing with the same contractor is still cheapest. Sometimes it's re-tender. Occasionally it's stop. You'll get the honest version.

Yes, all of them work standalone. Plenty of clients buy only a Buildability Report before purchase, or only a Rescue report on a stalled build. There's no obligation to take the rest of the journey, and we won't price it as though there is.

Remote inspection records what exists on a given day. Monitoring is continuous and comparative — it measures work against drawings, budget and programme, values it, and recommends whether a payment is justified. Inspection tells you what's there; monitoring tells you whether it's worth what you're about to pay.

Yes — our sister platform Apartments Ghana runs equivalent build-support services in Accra and across Ghana. If you're building in both countries we can run them on one account.

Important information

We act as your independent representative, not as your contractor. Except where you separately appoint a partner under Design & Build, we do not carry out construction work and do not assume delivery responsibility for it. Monitoring reduces the risk of paying for work that has not been done; it does not guarantee a contractor's performance, programme or solvency.

We do not hold client funds. Any handling or movement of your money is carried out by properly licensed banks, payment institutions or trustees, on their terms, which we will disclose before you commit. We do not operate escrow.

Buildability reports are advisory and preliminary. They are based on the plot information, estate rules, planning position and site observations available at the time. They are not a planning approval, not a structural or geotechnical report, and not a substitute for a soil investigation or a formal application to the relevant authority. Approval decisions rest with planning authorities and estate managements, not with us.

Cost figures are indicative. Construction cost ranges, HomeReady package prices and estimator outputs are planning estimates, not quotations, and exclude items expressly noted as excluded — commonly power infrastructure and estate development levies. Material prices in Nigeria move considerably. You receive an itemised written quotation before anything is ordered or commenced.

Professionals are independently qualified and regulated. Architects, engineers, surveyors and lawyers introduced through us are separately qualified and carry their own professional responsibility and insurance. We verify credentials and coordinate their work; we do not provide architectural, engineering, geotechnical, valuation or legal advice ourselves.

Turnkey availability is staged deliberately. Guaranteed Completion depends on third-party guarantors and is not currently available. We will not represent a route as live before it is.